| RECENT
PROJECTS LIST: Offshore
Kinematics and its parent company, Dockwise, have worked on more
floatover projects than any other company in the industry. These
include 22 projects either completed or in progress since 2003:
 |
McDermott
Chevron Platong: 19500 st, 8 pile (in progress, 2010)
Complete system design, analysis, and supply. |
 |
Woodside
North Rankin B: 17000 st, 4 pile (in progress, 2010)
Complete system design, analysis, and supply. |
 |
CPOC
Block B-17: 16000 t, 6 pile (in progress 2009)
Turnkey transportation and installation by floatover, including
all engineering and supply of deck mating hardware. |
 |
Conoco
North Belut: 14000 MT, 4 pile (in progress 2009)
Involved in early design development, now negotiating with
at details stage. |
 |
McDermott
Cuulong Su Tu Vang: 15000 MT, 8 pile (August 2008)
Involved in early design development, now negotiating with
at details stage. |
McDermott
PTTEP Arthit (Dockwise): 14000 MT, 8 pile
(November 2007)
Complete system design, analysis, and supply. |
 |
BP
AIOC AZERI PROJECT: Six Decks, 15,000 –17000
st, 8 pile (June 2003 - 2006)
Complete system development, design, analysis, and supply
from FEED to installation. |
COMPLETE
PROJECTS:
- McDermott
Chevron Platong: 19500 st, 8 pile (in progress, 2010)
Complete system design, analysis, and supply.
- Woodside
North Rankin B: 17000 st, 4 pile (in progress, 2010)
Complete system design, analysis, and supply.
- PDVSA
Corocoro CPF: 7000 st, 8 pile (in progress, 2010?)
Complete installation engineering, analysis, design for transportation
and installation.(final scope pending)
- CPOC
Block B-17: 16000 t, 6 pile (in progress 2009)
Turnkey transportation and installation by floatover, including
all engineering and supply of deck mating hardware.
- Total
Ofon (Dockwise): 12000 t, 6 pile (contract
awarded for 2009)
Transportation and operated vessels for this floatover installation
in the Nigeria under swell conditions.
- McDermott
Cuulong Su Tu Vang: 15000 MT, 8 pile (August 2008)
Involved in early design development, now negotiating with at
details stage.
- Woodside
Angel (Dockwise): 8000 t, 4 pile (March 2008)
Conduct transportation and operation of vessels for this floatover
installation in Australia.
- Exxon
Mobil East Area GX (Dockwise): 14500 t, 8
pile (2007)
Conducted transportation and operated vessels for this floatover
installation in the Nigeria under swell conditions.
- McDermott
PTTEP Arthit (Dockwise): 14000 MT, 8 pile
(November 2007)
Complete system design, analysis, and supply.
- BP
AIOC PCWU: Two Decks, 17000 st, 8 pile (November 2006)
Complete system development, design, analysis, and supply from
FEED to installation.
- Technip
Murphy Kikeh Spar: 3500 st, 4 pile (August 2006)
Complete system design, analysis, and supply. Involved in engineering
and development over several years, including model testing.
- BP
AIOC DUQ: Two Decks, 17000 st, 8 pile (June 2006)
Same scope for all six BP AIOC projects.
- Exxon
Mobil East Area GN (Dockwise): 18000 t, 8
pile (2005) Conducted transportation and operated vessels for
this floatover installation in the Nigeria under swell conditions.
- ConocoPhillips
Corocoro WHP: 1500 st, 6 pile (November 2005)
Turnkey installation engineering, analysis, design, supply and
offshore supervision. Further included deck, jacket and barge
redesign.
- BP
AIOC Azeri EA: 17000 st, 8 pile (June 2005)
- BP
AIOC Azeri WA: 17000 st, 8 pile (December 2004)
- BP
AIOC Azeri CA-CWP: 15500 st, 8 pile (June 2004)
- BP
AIOC Azeri CA-PDQ: 16000 st, 8 pile (December 2003)
Same scope for all six BP AIOC projects.
- ConocoPhillips
Bayu Undan (Dockwise): 11500 t, 8 pile (2003)
- ConocoPhillips
Bayu Undan (Dockwise): 13900 t, 8 pile (2003)
Conducted transportation and operated vessels for these two
floatover installations in Australia.
- Total
Elf Amenan (Dockwise): 11200 t Deck (2003)
Conducted transportation and operated vessels for this floatover
installation in the Middle East.
|