AZERI
PROJECT:
6 Platform
Development
- Client:
AIOC (BP & KBR)
- Location:
Caspian Sea
- Jacket
Weight: 15,000 - 17,000
- Other:
Conducted using a highly standardized procurment system to complete
ahead of schedule
|
SCOPE
of WORK: OKI
was contracted from FEED through final installation to perform
all research, development, engineering and supply for a six (6)
platform development averaging 17000 st per deck. OKI conducted
extensive part and assembly tests of the individual elastomer
components, fully assembled deck mating units, and sand can lowering
systems for loads up to 6,000 s. tons. The equipment supply includes
full assemblies and sand lowering system, with each fully assembled
unit tested to maximum load. |