AZERI PROJECT:

6 Platform Development

  • Client: AIOC (BP & KBR)
  • Location: Caspian Sea
  • Jacket Weight: 15,000 - 17,000
  • Other: Conducted using a highly standardized procurment system to complete ahead of schedule
SCOPE of WORK:

OKI was contracted from FEED through final installation to perform all research, development, engineering and supply for a six (6) platform development averaging 17000 st per deck. OKI conducted extensive part and assembly tests of the individual elastomer components, fully assembled deck mating units, and sand can lowering systems for loads up to 6,000 s. tons. The equipment supply includes full assemblies and sand lowering system, with each fully assembled unit tested to maximum load.

 


 

 