CPOC

Timeline: 2008
Location: Gulf of Thailand
Client: Dockwise
Operator: CPOC (Carigali-PTTEPI Operating Co.)
Topsides Weight: 19,000 MT

Project Description:
Dockwise was awarded the Transport & Installation scope for the MDPP offshore production platform at the Malaysia-Thailand Joint Development Area Blocks B17,C-19, and B-17-01. The Muda-A field lies 268km east of Songkhla, Thailand and 171km North of Kota Bharu, Malaysia.

OKI Scope of Work:
As part of the first complete Transport & Installation operation by the Dockwise Group, OKI completed the design, fabrication, full scale testing, and delivery of Leg Mating Units (LMUs) and Deck Support Units (DSUs). OKI personnel were onsite to supervise mating hardware installation.

Key Details:
OKI designed, manufactured, and delivered the following for the CPOC float-over installation:
8 Leg Mating Units
8 Deck Support Units