Example Projects
COMPLETED PROJECTS:
- McDermott Chevron Platong: 19500 st, 8 pile (2010) Complete system design, analysis, and supply.
- Woodside North Rankin B: 17000 st, 4 pile (2010) Complete system design, analysis, and supply.
- PDVSA Corocoro CPF: 7000 st, 8 pile (2010) Complete installation engineering, analysis, design for transportation and installation.(2010)
- CPOC Block B-17: 16000 t, 6 pile (2009) Turnkey transportation and installation by floatover, including all engineering and supply of deck mating hardware.
- Total Ofon (Dockwise): 12000 t, 6 pile (on hold) Transportation and operated vessels for this floatover installation in the Nigeria under swell conditions.
- McDermott Cuulong Su Tu Vang: 15000 MT, 8 pile (August 2008) Involved in early design development, now negotiating with at details stage.
- Woodside Angel (Dockwise): 8000 t, 4 pile (March 2008) Conduct transportation and operation of vessels for this floatover installation in Australia.
- Exxon Mobil East Area GX (Dockwise): 14500 t, 8 pile (2007) Conducted transportation and operated vessels for this floatover installation in the Nigeria under swell conditions.
- McDermott PTTEP Arthit (Dockwise): 14000 MT, 8 pile (November 2007) Complete system design, analysis, and supply.
- BP AIOC PCWU: Two Decks, 17000 st, 8 pile (November 2006) Complete system development, design, analysis, and supply from FEED to installation.
- Technip Murphy Kikeh Spar: 3500 st, 4 pile (August 2006) Complete system design, analysis, and supply. Involved in engineering and development over several years, including model testing.
- BP AIOC DUQ: Two Decks, 17000 st, 8 pile (June 2006) Same scope for all six BP AIOC projects.
- Exxon Mobil East Area GN (Dockwise): 18000 t, 8 pile (2005) Conducted transportation and operated vessels for this floatover installation in the Nigeria under swell conditions.
- ConocoPhillips Corocoro WHP: 1500 st, 6 pile (November 2005) Turnkey installation engineering, analysis, design, supply and offshore supervision. Further included deck, jacket and barge redesign.
- BP AIOC Azeri EA: 17000 st, 8 pile (June 2005)
- BP AIOC Azeri WA: 17000 st, 8 pile (December 2004)
- BP AIOC Azeri CA-CWP: 15500 st, 8 pile (June 2004)
- BP AIOC Azeri CA-PDQ: 16000 st, 8 pile (December 2003) Same scope for all six BP AIOC projects.
- ConocoPhillips Bayu Undan (Dockwise): 11500 t, 8 pile (2003)
- ConocoPhillips Bayu Undan (Dockwise): 13900 t, 8 pile (2003) Conducted transportation and operated vessels for these two floatover installations in Australia.
- Total Elf Amenan (Dockwise): 11200 t Deck (2003) Conducted transportation and operated vessels for this floatover installation in the Middle East.